What a site plan communicates
A site plan turns a project description into measurable locations. It commonly shows the property boundary, existing buildings, proposed construction, distances to lot lines, required setbacks, streets, north direction, and drawing scale. The exact list depends on the project and jurisdiction.
When one may be requested
Building and zoning applications often request a site plan when work changes a property’s footprint or outdoor use. Examples include additions, detached garages, sheds, decks, pools, fences, driveways, and accessory dwelling units. Ask your building department before drawing because thresholds and exemptions vary.
Site plan, plot plan, and survey
Site plan and plot plan are sometimes used interchangeably, although a department may define them differently. Both generally describe improvements on a parcel.
A boundary survey is different: a licensed surveyor locates property boundaries using legal records and field evidence. A drawing based on mapped parcel data does not become a survey.
Can you draw your own?
Some jurisdictions accept owner-prepared site plans for straightforward residential projects, while others require a surveyor, architect, engineer, or other qualified preparer. Acceptance depends on local rules and the project—not on the drawing tool used.
What to verify before submitting
- The required sheet size and scale
- The source and accuracy expected for property lines
- Front, rear, and side setback requirements
- Required dimensions and existing site features
- Whether zoning, drainage, utility, or professional-stamp information is needed
- The file format and number of copies for submission
How Permit Commander fits
Permit Commander helps you begin from an address, edit a scaled property drawing, place existing and proposed structures, enter setbacks, add dimensions, and export a PDF sheet with a title block, north arrow, scale, and legend. You remain responsible for checking the source information and local submission requirements.
How is a site plan different from a floor plan?
A site plan looks at the property and the relationship between its features. A floor plan looks inside a building and shows rooms, openings and other interior arrangements. A site plan may show a building footprint without explaining its internal layout. If the department requests both sheets, submitting one does not automatically satisfy the other.
Elevations show exterior faces, sections show a cut through construction, and detail sheets explain individual assemblies. Drainage information may require another drawing or a professional design. Keep the scope of each sheet clear. The presence of multiple drawing types in a PDF does not mean that structural or stormwater calculations have been prepared.
Why do reviewers ask for existing features?
Existing features give the proposed work context. A shed location makes more sense when the house, driveway and nearby structures are visible. The reviewer can then understand the approach to the site and the distances relevant to the project. What must be shown depends on the checklist, not on an exhaustive list of every object in the yard.
Use labels to separate existing construction from proposed additions, removals and relocations. A building footprint taken from mapped data is a starting point to verify, not a guarantee that every wall or projection is current. If a source omits a recent addition, update the drawing from accepted information and identify the change rather than leaving a misleading existing condition.
What does a setback line actually mean?
A setback line represents an offset from a boundary using the distance entered for that edge. It can help you visualize the space available for a proposed footprint. It does not determine which local rule applies, whether an exception exists, or whether all projections, easements and other restrictions have been accounted for.
Confirm the front, rear and side designations before drawing. This matters especially on corner or irregular lots. Ask how the distance is measured and which part of the construction must stay clear. A drafting tool can display the distances you give it, but those inputs need a reliable source and may require professional interpretation.
Is mapped parcel data enough for a submission?
Mapped parcel data may be useful for starting a draft, but only your department can tell you whether that source is acceptable for your application. A tax or geographic-information map serves a different purpose from a licensed boundary survey. Address lookup can also find the wrong parcel or an incomplete building outline, so confirm the parcel identity before drawing.
If a legal boundary is disputed, records conflict or precise placement depends on an uncertain line, consult a licensed surveyor. Do not treat a fence or aerial-image edge as definitive evidence. A site plan can use a survey as its source, but drawing property lines does not itself perform the survey work.
What makes a site plan useful even before submission?
A scaled drawing helps you explain the project to a contractor, reviewer or design professional. It makes assumptions visible: where the work sits, what dimensions were used and which conditions remain uncertain. You can compare alternative locations and identify the questions you need answered before committing to construction.
Keep the drawing’s limits visible too. Label preliminary work, verify its source records and retain notes about required professional documents. Permit Commander supports drafting and revisions; it does not approve the site, establish legal boundaries or certify a design. Use the drawing to improve the conversation, then complete the checks your project actually requires.